Not every project shipment needs a chartered vessel. A large share of project cargo, such as machinery, pipes, steel structures, generators and plant modules, can move in containers on regular liner services from Dubai. Choosing the right project cargo container saves money and keeps the shipment on a fixed schedule. This guide explains the options.
Why use containers for project cargo
- Regular weekly sailings from Jebel Ali to most ports
- Usually lower cost than breakbulk for medium-size items
- Cargo stays secured on one unit from origin to destination
- Easier trucking to and from the port
- Simple tracking under one bill of lading
Standard 20ft and 40ft containers
If the item fits through the doors and stays within the weight limit, a standard dry container is the cheapest choice. Spare parts, crated equipment, cable drums and many plant components travel this way. Our sea freight guide lists container sizes and cut-offs.
Open top containers
An open top container has a removable tarpaulin roof, so cargo can be loaded from above by crane. It suits tall items that cannot pass through the doors, such as machines, transformers or bundles of long steel. The cargo may stick out above the roof line, which makes it out-of-gauge (OOG) and adds a surcharge.
Flat rack containers
A flat rack has a floor and two end walls but no sides or roof. It is used for wide, heavy or awkward items: vehicles, boats, excavators, tanks and frames. Collapsible flat racks can also be stacked when empty. Cargo wider than the rack is out-of-gauge. Our out-of-gauge cargo guide explains how carriers price and load these.
Platforms and multiple flat racks
For very long or heavy pieces, a platform (a flat rack with no end walls) or several flat racks placed side by side in the ship's hold can carry the load. Above a certain size or weight, breakbulk or heavy-lift is usually better; see our project cargo and heavy-lift guide.
Information we need to choose the right container
- Length, width and height of each piece, with drawings if possible
- Gross weight and centre of gravity
- Lifting points and whether the item can be forklifted
- Packing: crate, skid or unpacked
- Port of loading, destination and site address
- Ready date and required delivery date
Lashing, securing and surveys
Project cargo in flat racks and open tops must be lashed and blocked by experienced crews. Many shippers book a lashing survey and photos before the box leaves the yard, which also helps with marine cargo insurance claims.
Costs to plan for
- Ocean freight for the special container
- Out-of-gauge surcharge where cargo exceeds container size
- Special handling at the port and crane hire
- Lashing materials and labour
- Permits and escorts for oversized trucking
- Documentation and customs, see customs clearance documents
Multi-vendor project shipments
Large projects often have many suppliers. Combining their cargo into containers under one packing list keeps the site organised. Our multi-vendor project cargo guide covers cargo registers and site delivery.
Ship project cargo containers with NHK Logistics LLC
NHK Logistics LLC books standard, open top and flat rack containers from Jebel Ali, arranges lashing and oversized trucking, and handles customs. See our project cargo services and send dimensions and weights through the quote form. Equipment availability and carrier rules change, so we confirm them for each shipment.